UP 5073 meets a parade of construction equipment, West Chicago, IL

Filed Under: Uncategorized    by: admin

Tags: , , , , , , ,

2 Responses to “UP 5073 meets a parade of construction equipment, West Chicago, IL”

  1. mt90945557 Says:

    Yep, just like all the highways.

    But yea, this construction cause freights to be delayed. On the way back to downtown Chicago, I saw 4 freight trains waiting on the metra I was on to clear out because the freights didn’t have three tracks to use. That would have been more videos I would have gotten. Construction sucks.

  2. Andrewsaxamophone Says:

    That first piece construction equiptment is a new one to me. Isn’t it a little ironic that when one E-W road is under construction, the other E-W roads next to it are also under construction, while the UP E-W line is under construction the same time the BNSF E-W line is.

Leave a Reply

Powered by WP VideoTube